antonioalves
antonioalves3w ago

Flows cancelled by monitor

I have some scheduled flows that consistenly get cancelled by monitor because "was hanging in between 2 steps. ". I can't figure out why it breaks, if I run the flow manualy, it gets the job done without problem. I can't reproduce with a minimal flow, but I can send my actual flows in private, if neeeded Version: CE v1.555.0 OS: Debian GNU/Linux 11 (bullseye) x86_64 CPU: Intel Xeon (4) @ 2.800GHz Memory: 12834MiB / 23544MiB
3 Replies
antonioalves
antonioalvesOP3w ago
the error
rubenf
rubenf3w ago
We will need a minimal reproduction to investigate. There are no difference between flows ran manually or not so maybe it's just a question of frequencny Try to see if you can reproduce consistently with a very frequent schedule and replace step by step what you can with fake logic and sending the flow and sending the last state before you have this error might be helpful as well as the worker logs of the worker that handle the last correct transition at the time it did the transition
antonioalves
antonioalvesOP3w ago
I think that i found the culprit InternalError: SqlErr: error returned from database: could not extend file "base/16384/16455": No space left on device @jobs.rs:4229:5 one of the flows the got the error throw this error I'll investigate more, but I think that it thnks!

Did you find this page helpful?